First thing: Note on Team Slack Channel
Please make a note on your team slack channel (one per team is enough).
- Either:
team02 submitted
- Or:
team02 still in progress
Then, complete P13, depending on which of these applies to you:
P13: If finished with team02
Do your second Retro. Click the triangle for details
Details of how to do Retro 2
- Review how to do a retro: https://ucsb-cs156.github.io/topics/agile/agile_retros.html
- Then, go to your folder on Google Drive (the link should be pinned to your slack channel)
- Create a new document Retro2 similar to Retro1
- Conduct a retro following the same basic instructions from here:
One change to the instructions: before deciding on a new experiment, have a discussion of the experiment from your last retro.
- Read the experiment from your Retro1 document.
- In your Retro2 document, make a section “Last Retros Experiment”
- Copy/paste the description of the experiment.
- Then, invite each member of the team to write something on the slack channel indicating whether they thought the experiment had a successful outcome, a failed outcome, an indeterminate outcome (can’t tell) or a mix, and why. But don’t press enter until there’s a signal that everyone is finished.
- Then you call all press enter and see what each other wrote.
- Discuss. If possible come to a consensus summary. If a consensus doesn’t emerge after a few minutes of discussion, then you can “agree to disagree”.
- Write down either a summary of your consensus, or a summary of your differing opinions.
Then, come up with a new experiment for this Retro. It can be a variation on the old one (i.e. a different approach to the same problem), or could be entirely different (some other aspect of the team’s performance.)
P13: If NOT finished with team02
- Do a standup on the team slack channel
- Make a note on the slack channel of any team members that are not participating in class today
- Then do an out loud standup
- Next, Review the Kanban board as a team
- Finally, get to work (collaboratively) on whatever needs to be done to get team02 finished.
Remember that you work as a team, so if you are done with “your part”, help other team members with “their parts”.
When will team03 be ready
Really soon! Perhaps even before Thursday; I’ll ping you all as soon as it’s done.